PERMIT APPLICATION COMMON
Where on your property are you working?:
Pier 66 - overwater along pier and waterward to the southwest, curving to the southeast.
Terminal 46 - upland work is along the east margin of the property, extending to the northern margin and turning east to west, and then waterward to the northwest toward Pier 66.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Industrial
Project Value:
15000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
04/27/2026
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
400000
Total Intake Value:
400000
Total Issued Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2021 SEBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
Add/Alt
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Other
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property