PERMIT APPLICATION COMMON
Where on your property are you working?:
East Site
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
450000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
12/15/2025
Permit Remarks:
Building permit issuance is required prior to final inspection for this demolition permit; or all disturbed areas shall be fully stabilized, and side sewers shall be capped
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
Tenant Relocation Assistance
Are there residential (non-commercial) tenants/renters currently living in the property? :
No
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
No
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
DEMOLITION INFO
Type of Demolition:
Demolition