PERMIT APPLICATION COMMON
Where on your property are you working?:
Off of alley behind exist SFR (to remain)
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
500000
LARGE PUBLIC PROJECTS
Is this a Light Rail Temporary Use for Construction application?:
No
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
12/19/2025
Permit Remarks:
ADDRESS ASSIGNED FOR N UNIT) 7719A, S UNIT) 7719B 16TH AVE SW
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
385959
Intake Value: Alteration:
0
Total Intake Value:
385959
Issue Value: New:
385959
Issue Value: Alteration:
0
Total Issued Value:
385959
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2021 SBC (Struct) and SRC (Arch)
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
New
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Existing Onsite Parking:
1
# of Proposed Onsite Parking:
2
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Total UA Alternative
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
Yes