PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
600000
LARGE PUBLIC PROJECTS
Is this a Light Rail Temporary Use for Construction application?:
No
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
12/15/2025
Permit Remarks:
ADDRESS ASSIGNED FOR SFR1) 5053A, SFR2) 5053B, SFR3) 5053C 25TH AVE SW
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
358422
Intake Value: Alteration:
0
Total Intake Value:
358422
Issue Value: New:
358422
Issue Value: Alteration:
0
Total Issued Value:
358422
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2021 SRC
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
n/a
PARKING
# of Existing Onsite Parking:
0
# of Proposed Onsite Parking:
3
Tenant Relocation Assistance
Are there residential (non-commercial) tenants/renters currently living in the property? :
No
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Related New Construction Project:
7101525
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Weep Hole
Total Disturbed Area:
4799
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
3192
Total Volume Managed by On-Site Stormwater Management (gallons):
30140
Total Area Requiring Soil Amendment:
1607
SANITARY INFORMATION
Sanitary Type of Work:
None
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
Yes