PERMIT APPLICATION COMMON
Where on your property are you working?:
The work will be located within the exterior courtyard of the school site. Most of the construction work will take place where the existing playground is located.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Institutional
Project Value:
400000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
04/08/2025
Permit Issued Date:
07/24/2025
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
400000
Total Intake Value:
400000
Issue Value: New:
400000
Issue Value: Alteration:
0
Total Issued Value:
400000
BUILDING CODE INFO
What building code was used for your design?:
2021 SBC (Struct) and SRC (Arch)
Action Type:
Add/Alt
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
0
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Other
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
0
SIDE SEWER INFORMATION
Related New Construction Project:
7070041
DRAINAGE INFORMATION
Drainage Type of Work:
Addition/Alteration
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
On Site
Total Disturbed Area:
6835
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
5408
Total Volume Managed by On-Site Stormwater Management (gallons):
78585
Total Area Requiring Soil Amendment:
1427
SANITARY INFORMATION
Sanitary Type of Work:
None
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
LWSUNI*011PF
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.: