PERMIT APPLICATION COMMON
Where on your property are you working?:
Addition will be to the south side of the existing SFR
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
104000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
05/30/2025
Permit Issued Date:
08/25/2025
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
37081
Intake Value: Alteration:
66919
Total Intake Value:
104000
Issue Value: New:
37081
Issue Value: Alteration:
66919
Total Issued Value:
104000
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2021 SRC
Action Type:
Add/Alt
Main Existing Use of Building:
Residential
Existing Occupancy:
R-3 Single Family Dwelling
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Basement
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Proposed Onsite Parking:
0
Tenant Relocation Assistance
Are there residential (non-commercial) tenants/renters currently living in the property? :
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
SIDE SEWER INFORMATION
Side Sewer Conflict:
Yes
Side Sewer Conflict Description:
Existing storm drain is in location of addition. Either re-route under an SDCI Side Sewer Permit or convert to plumbing under a King County Plumbing Permit.
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
Yes