PERMIT APPLICATION COMMON
Where on your property are you working?:
The majority of the work will be done on the 4th floor. Removing conduit/piping that runs from the ground floor to the roof will require minor work to be done on all levels for patching and repairing.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Commercial
Project Value:
508635
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
01/17/2025
Permit Issued Date:
06/23/2025
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
508635
Total Intake Value:
508635
Issue Value: New:
0
Issue Value: Alteration:
508635
Total Issued Value:
508635
BUILDING CODE INFO
What building code was used for your design?:
2021 SEBC
Is this a substantial alteration?:
No
Are you changing the envelope?:
Yes
Action Type:
Add/Alt
Number of Existing Building Stories:
6
Number of Proposed Building Stories:
0
Number of Proposed Below-Grade Building Stories:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Business
Existing Occupancy:
B Office
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Are there residential (non-commercial) tenants/renters currently living in the property? :
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
Is there any ground-mounted exterior equipment?:
No
Is there any wall-mounted exterior equipment?:
No
Is there any rooftop equipment? :
Yes
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Prescriptive
Describe any other mechanical systems to be installed as part of this project.:
New air to water heat pumps will be installed on the roof to provide thermal control to (only) the 4th floor.
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
RUBICPS905DB