PERMIT APPLICATION COMMON
Where on your property are you working?:
The project will encompass the entire parcel.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
75000000
CONSTRUCTION VALUATION INFO
Intake Value: New:
13581360
Intake Value: Alteration:
0
Total Intake Value:
13581360
Issue Value: New:
13581360
Issue Value: Alteration:
0
Total Issued Value:
13581360
INTERDEPARTMENTAL COORDINATION
SDOT Concept Approval:
Yes
SDOT Permit Accepted:
Yes
SDOT SIP PM:
WMM
BUILDING CODE INFO
What building code was used for your design?:
2021 SBC
Is this a substantial alteration?:
Yes
Are you changing the envelope?:
Yes
Action Type:
New
Number of Existing Building Stories:
2
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
1
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Assembly
Existing Occupancy:
A-5 Stadium
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
03/27/2025
Permit Issued Date:
10/09/2025
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
Number of Existing Onsite Parking Spaces:
0
Number of Existing Offsite Parking Spaces:
0
Number of Existing Accessible Parking Spaces:
0
Number of Proposed Onsite Parking Spaces:
0
Number of Proposed Offsite Parking Spaces:
0
Offsite Parking Location:
NA
Number of Proposed Accessible Parking Spaces:
0
Number of Proposed Bicycle Parking Spots:
24
Tenant Relocation Assistance
Are there residential (non-commercial) tenants/renters currently living in the property? :
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
Elevator Pressurization:
No
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
Is there any ground-mounted exterior equipment?:
No
Is there any wall-mounted exterior equipment?:
No
Is there any rooftop equipment? :
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Component Performance
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
Yes
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Special Requirements:
Envelope and mechanical review under phase 2.
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
2
Flow Control Type:
Pipe
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
319985
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
273750
Total Volume Managed by On-Site Stormwater Management (gallons):
232157
Total Area Requiring Soil Amendment:
46235
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
2
Number of New Dwelling Units:
0
Reuse Existing Side Sewer System:
Yes
SPECIAL PROGRAMS
Is this project receiving Opportunity Zone Funds?:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
SELLEC*372N0