PERMIT APPLICATION COMMON
Where on your property are you working?:
First floor tenant space.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
9900000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
01/16/2025
Permit Issued Date:
05/05/2025
Inspections Completed Date:
09/16/2025
Certificate of Occupancy Issued Date:
09/16/2025
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
4379520
Total Intake Value:
4379520
Issue Value: New:
0
Issue Value: Alteration:
4379520
Total Issued Value:
4379520
Initial TI Shell and Core:
Yes
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
No
Are you changing the envelope?:
Yes
Action Type:
Add/Alt
Number of Existing Building Stories:
7
Number of Existing Below-Grade Building Stories:
3
Number of Proposed Building Stories:
7
Number of Proposed Below-Grade Building Stories:
3
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Main Existing Use of Building:
Business
Existing Occupancy:
B Office
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Are there residential (non-commercial) tenants/renters currently living in the property? :
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Fire Alarm:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Not Reviewed
Elevator Pressurization:
No
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
Is there any ground-mounted exterior equipment?:
No
Is there any wall-mounted exterior equipment?:
No
Is there any rooftop equipment? :
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
VRV Heat Pumps and Fan Coils heat/cool the tenant space. Energy Recovery Ventilators will be utilized to pre-heat and pre-cool outside air.
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Special Hazards
Energy Storage System:
Yes
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
GRAHACM954CG