PERMIT APPLICATION COMMON
Where on your property are you working?:
Onsite + ROW
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
347900
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
12/17/2024
Permit Issued Date:
06/11/2025
Permit Remarks:
ADDRESS ASSIGNED: SFR: 2314, DADU: 2316 S FOREST ST, AADU: 2821 HARRIS PL S.
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
347900
Intake Value: Alteration:
0
Total Intake Value:
347900
Issue Value: New:
347900
Issue Value: Alteration:
0
Total Issued Value:
347900
BUILDING CODE INFO
What building code was used for your design?:
2021 SBC (Struct) and SRC (Arch)
Action Type:
Add/Alt
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
New curb cut along Harris Pl S to be established to SDOT standards. Separate SDOT permit required.
PARKING
# of Existing Onsite Parking:
1
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
1
Tenant Relocation Assistance
Are there residential (non-commercial) tenants/renters currently living in the property? :
No
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
No
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
Yes
Other Type of Sprinkler System:
NFPA 13D in new ADU and DADU
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Related New Construction Project:
7047183
Temporary Dewatering for Construction:
No
Pipe Lining in the Right-of-Way:
Yes
Curb Crossing and/or Staging:
Yes
Excavation:
Yes
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Discharge Point Other Type:
(S Forest St)
Total Disturbed Area:
4142
New Impervious Surface:
790
New Plus Replaced Impervious Surface:
1424
Total Volume Managed by On-Site Stormwater Management (gallons):
10292
Total Area Requiring Soil Amendment:
1928
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
2
Reuse Existing Side Sewer System:
Yes
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
CASCABL906BK