PERMIT APPLICATION COMMON
Where on your property are you working?:
Playground will be constructed in the area south of the parking lot, east of the farm plots and west of the circular walking path.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Institutional
Project Value:
790000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
06/11/2025
Permit Issued Date:
11/12/2025
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
790000
Total Intake Value:
790000
Issue Value: New:
0
Issue Value: Alteration:
790000
Total Issued Value:
790000
BUILDING CODE INFO
What building code was used for your design?:
2021 SBC
Action Type:
Add/Alt
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Other
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Existing Accessible Parking:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
Bio-Engineer
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
10663
New Impervious Surface:
4157
New Plus Replaced Impervious Surface:
4930
Total Volume Managed by On-Site Stormwater Management (gallons):
68340
Total Area Requiring Soil Amendment:
5733
SANITARY INFORMATION
Sanitary Type of Work:
None
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Authorized Government Representative
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
Yes