PERMIT APPLICATION COMMON
Where on your property are you working?:
Northeast portion of property, primarily in the rear yard.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
500000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
12/12/2024
Permit Remarks:
ADDRESS ASSIGNED: DADU- 3432 WALNUT AVE
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
132249
Total Intake Value:
132249
Total Issued Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2021 SRC
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
Add/Alt
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Related New Construction Project:
7045204
Temporary Dewatering for Construction:
No
Curb Crossing and/or Staging:
Yes
Excavation:
Yes
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Weep Hole
Discharge Point Other Type:
Walnut Ave SW
Total Disturbed Area:
2110
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
1270
Total Volume Managed by On-Site Stormwater Management (gallons):
0
Total Area Requiring Soil Amendment:
840
SANITARY INFORMATION
Sanitary Type of Work:
None