PERMIT APPLICATION COMMON
Where on your property are you working?:
the middle portion of the property
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Institutional
Project Value:
3000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
09/06/2024
Permit Issued Date:
06/20/2025
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
3000000
Intake Value: Alteration:
0
Total Intake Value:
3000000
Issue Value: New:
3427771
Issue Value: Alteration:
0
Total Issued Value:
3427771
BUILDING CODE INFO
What building code was used for your design?:
2018 SBC
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
New
Number of Existing Building Stories:
2
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Residential
Existing Occupancy:
R-3 Single Family Dwelling
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Basement
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
22' on the west side of 39th ave S
PARKING
# of Existing Onsite Parking:
0
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
40
# of Proposed Offsite Parking:
0
Offsite Parking Location:
0
# of Proposed Accessible Parking:
2
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
10
Tenant Relocation Assistance
Are there residential (non-commercial) tenants/renters currently living in the property? :
Yes
Will the scope of the proposed project displace the tenants/renters?:
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
Is there any ground-mounted exterior equipment?:
No
Is there any wall-mounted exterior equipment?:
No
Is there any rooftop equipment? :
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Commercial
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
Yes
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
heat pumps and DOAS
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Cooling Fuel Type Proposed: Non-Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Related New Construction Project:
7041426
Temporary Dewatering for Construction:
No
Curb Crossing and/or Staging:
Yes
Excavation:
Yes
Curb and Sidewalk Restoration?:
Yes
Roadway Restoration:
Yes
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
Basic
Discharge Point:
Storm System
Total Disturbed Area:
36976
New Impervious Surface:
4335
New Plus Replaced Impervious Surface:
29945
Total Volume Managed by On-Site Stormwater Management (gallons):
205365
Total Area Requiring Soil Amendment:
7031
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
2
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
0
Reuse Existing Side Sewer System:
No
SPECIAL PROGRAMS
Is this project receiving Opportunity Zone Funds?:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
ZSAINI*846CW