PERMIT APPLICATION COMMON
Where on your property are you working?:
Work is being done within the existing house and deck footprint, plus a three foot cantilever to the west at the new second floor.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
350000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
11/09/2021
Permit Issued Date:
10/10/2022
Permit Remarks:
Building permit issuance is required prior to final inspection for this demolition permit; or all disturbed areas shall be fully stabilized, and the branch of the existing side sewer that serves the existing house shall be capped. (Note: protect the portions of the existing, shared side sewer that serves the properties to the north and south.)
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
Yes
What is the amount of ground disturbance?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Basement
DEMOLITION INFO
Type of Demolition:
Demolition
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
WILKIBL877QQ