PERMIT APPLICATION COMMON
Where on your property are you working?:
No ground disturbing activities. All work to be contained on property. All vertical construction to be removed and taken off site by dumpster with Waste Management. All trees to be retained.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
100000
PERMIT TRACKING COMMON
Review Level:
Field
Application Completed Date:
02/16/2024
Permit Issued Date:
02/27/2024
Permit Remarks:
Two curb cuts along Aurora Ave N to be removed and restored to SDOT standards. Separate SDOT permit required.
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
Tenant Relocation Assistance
Are there residential (non-commercial) tenants/renters currently living in the property? :
No
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
No
What is the amount of ground disturbance?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Other
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
IBEXCC*781Q1