PERMIT APPLICATION COMMON
Where on your property are you working?:
My backyard directly behind my existing home.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
200000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
12/22/2023
Permit Issued Date:
05/11/2024
Inspections Completed Date:
06/17/2025
Permit Remarks:
RT 02/13/2024: DADU ADDRESS ASSIGNMENT 9726 PALATINE AVE N.
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
174390
Intake Value: Alteration:
0
Total Intake Value:
174390
Issue Value: New:
174390
Issue Value: Alteration:
0
Total Issued Value:
174390
BUILDING CODE INFO
What building code was used for your design?:
2018 SRC
Is this a substantial alteration?:
No
Action Type:
Add/Alt
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Will your application include a new standard plan?:
Yes
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Piles
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
20ft at the front of the home for driveway creation.
PARKING
# of Existing Onsite Parking:
0
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
Offsite Parking Location:
Street
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
0
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
SIDE SEWER INFORMATION
Side Sewer Conflict:
Yes
Side Sewer Conflict Description:
According to City records, the proposed DADU is located over the existing sanitary and/or drainage side sewers serving the house. You can find the location of the existing side sewers on the Seattle Public Utilities Water and Sewer Map at https://www.seattle.gov/utilities/construction-resources/water-and-sewer-map. To allow for future maintenance and repairs, the side sewer should either be rerouted around the structure or brought up to plumbing standards.
SPECIAL PROGRAMS
Is this project receiving Opportunity Zone Funds?:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
Yes