PERMIT APPLICATION COMMON
Where on your property are you working?:
Internal - commercial space and garage
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
50000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
12/26/2023
Permit Issued Date:
01/30/2024
Inspections Completed Date:
05/09/2024
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
50000
Total Intake Value:
50000
Issue Value: New:
0
Issue Value: Alteration:
59883
Total Issued Value:
59883
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
Add/Alt
Number of Existing Building Stories:
8
Number of Existing Below-Grade Building Stories:
2
Number of Proposed Building Stories:
8
Number of Proposed Below-Grade Building Stories:
2
Number of Mezzanines:
1
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Residential
Existing Occupancy:
R-2 Apartment/Condominium
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Are there residential (non-commercial) tenants/renters currently living in the property? :
Yes
Will the scope of the proposed project displace the tenants/renters?:
No
WASTE DIVERSION
Waste Diversion Plan Required:
No
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Not Reviewed
Elevator Pressurization:
Yes
Stairway Pressurization:
Yes
Smoke Removal System:
No
Accessible Elevator Egress:
Yes
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Prescriptive
Is there a fume hood?:
No
Is there a spray paint booth?:
No
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Unknown
Special Requirements:
C406.3 & C406.4/A-101
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
WGCLAC*370N0