PERMIT APPLICATION COMMON
Where on your property are you working?:
Work will occur on the east portion of the school property, between the existing gym and 8th Avenue South, and between S Concord St and S Henderson St. The work area is approximately 3/4 acres.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Institutional
Project Value:
1600000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
03/28/2024
Permit Issued Date:
09/06/2024
Inspections Completed Date:
12/10/2025
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
1600000
Total Intake Value:
1600000
Issue Value: New:
0
Issue Value: Alteration:
1600000
Total Issued Value:
1600000
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2018 SBC
Action Type:
Add/Alt
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Other
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
SIDE SEWER INFORMATION
Related New Construction Project:
6978202
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
Infiltration
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
30371
New Impervious Surface:
2550
New Plus Replaced Impervious Surface:
19539
Total Volume Managed by On-Site Stormwater Management (gallons):
394431
Total Area Requiring Soil Amendment:
10052
SANITARY INFORMATION
Sanitary Type of Work:
None
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
DIVEREW804NU
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
No