PERMIT APPLICATION COMMON
Where on your property are you working?:
The existing building to removed is centered on the middle of the property (8800 SF level lot). The southern end of the lot shows on the GIS map as an ECA1 (steep slope) however the building is sited on the level area on the north side.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
55000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
05/08/2023
Permit Issued Date:
06/13/2023
Inspections Completed Date:
03/04/2024
Permit Remarks:
Building permit issuance is required prior to final inspection for this demolition permit; or all disturbed areas shall be fully stabilized, and side sewers shall be capped.
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
Tenant Relocation Assistance
Are there residential (non-commercial) tenants/renters currently living in the property? :
No
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
No
What is the amount of ground disturbance?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Other
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
DICKSC*858RZ