PERMIT APPLICATION COMMON
Where on your property are you working?:
ON THE EAST SIDE OF THE BUILDING WITHIN THE EXISTING ON-SITE PARKING LOT
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
1000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
01/09/2025
Permit Issued Date:
05/16/2025
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
379640
Intake Value: Alteration:
620360
Total Intake Value:
1000000
Issue Value: New:
379640
Issue Value: Alteration:
620360
Total Issued Value:
1000000
BUILDING CODE INFO
What building code was used for your design?:
2021 SEBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
No
Are you changing the envelope?:
Yes
Action Type:
Add/Alt
Number of Existing Building Stories:
2
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Business
Existing Occupancy:
B Classroom > 12th Grade
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Existing Onsite Parking:
21
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
2
# of Proposed Onsite Parking:
23
# of Proposed Offsite Parking:
0
Offsite Parking Location:
NA
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
4
# of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
Yes
Fire Alarm:
Yes
Other Fire Protection System:
No
Other Type of Sprinkler System:
NFPA 13 to be installed in existing and new additions north of fire wall,
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
Yes
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
SPLIT SYSTEM
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
MARPACL055JP