PERMIT APPLICATION COMMON
Where on your property are you working?:
This permit request is seeking to remove an existing structure, leaving the slab and foundation in-place (to not disrupt existing soils and drainage). Salvage & demolition operations will utilize existing paving and access driveways.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Industrial
Project Value:
150000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
01/10/2023
Permit Issued Date:
02/21/2023
Inspections Completed Date:
11/22/2024
Permit Remarks:
Demolition permit for commercial building. Building permit issuance is required prior to the final inspection for this demolition permit; or all disturbed areas shall be fully stabilized and side sewers shall be capped.
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
Are there residential (non-commercial) tenants/renters currently living in the property? :
No
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
What is the amount of ground disturbance?:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
FORMACC878OR