PERMIT APPLICATION COMMON
Where on your property are you working?:
See attached drawings.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Industrial
Project Value:
21000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
04/07/2023
Permit Issued Date:
08/29/2025
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
21000000
Total Intake Value:
21000000
Issue Value: New:
0
Issue Value: Alteration:
21000000
Total Issued Value:
21000000
BUILDING CODE INFO
What building code was used for your design?:
2018 SBC
Action Type:
Add/Alt
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Other
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
N/A
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
No
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
No
SIDE SEWER INFORMATION
Related New Construction Project:
6887836
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Drainage Type of Work:
Addition/Alteration
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
226872
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
226627
Total Volume Managed by On-Site Stormwater Management (gallons):
0
SANITARY INFORMATION
Sanitary Type of Work:
Addition/Alteration
Number of New Connections to the Side Sewer:
1
Number of Sewer New/Replaced/Repair Pumps:
1
Reuse Existing Side Sewer System:
Yes
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
GRANICC916DL