PERMIT APPLICATION COMMON
Where on your property are you working?:
ALL OF THE SITE AND BUILDING FOOTPRINT WILL REQUIRE EXTENSIVE
REGRADING. SEE PASV FOR REFERENCE.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
0
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
07/12/2022
Permit Issued Date:
08/15/2022
Inspections Completed Date:
04/26/2023
Permit Remarks:
Building permit issuance is required prior to final inspection for this demolition permit or all disturbed areas have been stabilized and the side sewer has been capped.
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
Tenant Relocation Assistance
Residential Unit Occupancy:
All Residential Units Occupied by Property Owner
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Basement
DEMOLITION INFO
Type of Demolition:
Demolition
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
HAMMEHI930M7