PERMIT APPLICATION COMMON
Where on your property are you working?:
Work will occur on the waterward edge of the Denny Way CSO Regulator plaza sea wall on parcel numbers 7666202251, 7666202250, and the unopened SDOT Denny Way ROW. All work will occur above the high tide line (EL 13.04’).
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Industrial
Project Value:
58000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
04/20/2021
Permit Issued Date:
06/10/2022
Permit Remarks:
SDOT responsible for floodplain development in right of way
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
58000
Total Intake Value:
58000
Issue Value: New:
0
Issue Value: Alteration:
58000
Total Issued Value:
58000
BUILDING CODE INFO
What building code was used for your design?:
2018 SEBC
Action Type:
Add/Alt
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
0
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
Foundation Type:
Other
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Existing Onsite Parking:
0
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
Offsite Parking Location:
0
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
No
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Public Utility
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
Yes
WASTE DIVERSION
Waste Diversion Plan Required:
No