PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
03/26/2021
Permit Issued Date:
08/30/2021
Inspections Completed Date:
11/07/2022
CONSTRUCTION VALUATION INFO
Intake Value: New:
657402
Intake Value: Alteration:
0
Total Intake Value:
657402
Issue Value: New:
808516
Issue Value: Alteration:
0
Total Issued Value:
808516
Total Revision Value:
0
PERMIT APPLICATION COMMON
Where on your property are you working?:
Whole site
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
404402
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
Widen existing curb cut to standard 10' wide residential curb cut along 48th Ave NE.
PARKING
# of Existing Onsite Parking:
0
# of Proposed Onsite Parking:
1
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
0
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Basement
Tenant Relocation Assistance
Residential Unit Occupancy:
All Residential Units Occupied by Property Owner
BUILDING CODE INFO
What building code was used for your design?:
2018 SRC
Action Type:
New
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
WASTE DIVERSION
Waste Diversion Plan Required:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
Data Center Building?:
No
Power is Sub-Metered?:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
5872
New Impervious Surface:
1554
New Plus Replaced Impervious Surface:
3216
Total Volume Managed by On-Site Stormwater Management (gallons):
44555
Total Area Requiring Soil Amendment:
2656
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
1
Reuse Existing Side Sewer System:
Yes
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
Yes