PERMIT APPLICATION COMMON
Where on your property are you working?:
In the southern half of the site
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Institutional
Project Value:
550000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
01/13/2021
Permit Issued Date:
07/20/2021
Inspections Completed Date:
01/06/2022
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
5000
Total Intake Value:
5000
Issue Value: New:
5000
Issue Value: Alteration:
0
Total Issued Value:
5000
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Action Type:
Add/Alt
Number of Existing Building Stories:
0
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
0
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Other
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
DRAINAGE INFORMATION
Drainage Type of Work:
Addition/Alteration
Number of Other New Drainage Connections:
1
Flow Control Type:
Vault
Flow Control Standard:
Pasture and Peak
Treatment Standard Type:
Basic Plus
Basic Plus Type:
Enhance
Discharge Point:
Storm System
Total Disturbed Area:
16262
New Impervious Surface:
12820
New Plus Replaced Impervious Surface:
12820
Total Volume Managed by On-Site Stormwater Management (gallons):
0
Total Area Requiring Soil Amendment:
3442
SANITARY INFORMATION
Sanitary Type of Work:
None
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
PREMIFD971RW
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
No