PERMIT APPLICATION COMMON
Where on your property are you working?:
The work is primarily to the interior of the building with a new entry vestibule, canopy and alley entry gate proposed. The scope may include replacement of existing windows.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
3275000.00
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
05/05/2021
Permit Issued Date:
03/02/2022
Inspections Completed Date:
05/03/2023
Certificate of Occupancy Issued Date:
05/03/2023
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
3275000
Total Intake Value:
3275000
Issue Value: New:
569882
Issue Value: Alteration:
2705118
Total Issued Value:
3275000
BUILDING CODE INFO
What building code was used for your design?:
2018 SEBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
Yes
Are you changing the envelope?:
Yes
Action Type:
Add/Alt
Number of Existing Building Stories:
3
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
4
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Main Existing Use of Building:
Business
Existing Occupancy:
B Office
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
Not applicable
PARKING
# of Existing Onsite Parking:
0
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
Offsite Parking Location:
NA
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
4
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
Elevator Pressurization:
No
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
Mechanical System Scope:
Full Mechanical design,
6837438-me reviewed by PM not approved yet. TSPR not required per c407. cycle 2 M sheets OK
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
Is there any rooftop equipment? :
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Commercial
Compliance Path:
Total Building Performance (TBP)
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
Heatpump water heater.
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Special Requirements:
DOAS. C412 onsite renewable using exception 3. Solar readiness per c411. C407 claim lighting credit. page 23-25 in report. HP water heater under Plumbing permit SR1455633 on page P1.0
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
MRJCOL*011CW