PERMIT APPLICATION COMMON
Where on your property are you working?:
Basement level near Lobby & Existing Gym; 1st floor Parking level
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
1000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
12/21/2020
Permit Issued Date:
04/01/2023
Inspections Completed Date:
09/30/2025
Certificate of Occupancy Issued Date:
09/30/2025
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
1000000
Total Intake Value:
1000000
Issue Value: New:
0
Issue Value: Alteration:
1000000
Total Issued Value:
1000000
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
Add/Alt
Number of Existing Building Stories:
6
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
6
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Main Existing Use of Building:
Residential
Existing Occupancy:
R-2 Apartment/Condominium
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
n/a
PARKING
# of Existing Onsite Parking:
123
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
10
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
Offsite Parking Location:
0
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
20
# of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
Yes
Other Type of Sprinkler System:
dry system in parking areas
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Residential
Compliance Path:
Total UA Alternative
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Describe any other mechanical systems to be installed as part of this project.:
new intake air; electric wall heaters
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
Special Requirements:
no PV( UA 15% better)
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
BUILDIL902JW