PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Institutional
Project Value:
179520000
CONSTRUCTION VALUATION INFO
Intake Value: New:
83884958
Intake Value: Alteration:
0
Total Intake Value:
83884958
Issue Value: New:
66720735
Issue Value: Alteration:
0
Total Issued Value:
66720735
BUILDING CODE INFO
What building code was used for your design?:
2018 SBC
Is this a substantial alteration?:
No
Action Type:
New
Number of Proposed Building Stories:
6
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
Yes
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
03/05/2021
Permit Issued Date:
10/18/2021
Inspections Completed Date:
04/10/2024
Certificate of Occupancy Issued Date:
04/10/2024
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
N/A
PARKING
Number of Proposed Onsite Parking Spaces:
83
Number of Existing Bicycle Parking Spots:
0
Number of Proposed Bicycle Parking Spots:
92
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Fire Alarm:
Yes
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
No
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Total Building Performance (TBP)
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Other
Special Requirements:
SEC C412: PV
heating fuel:
heat pump chiller & gas boiler
SIDE SEWER INFORMATION
Related New Construction Project:
6798148
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Number of Drainage New/Replaced/Repair Pumps:
1
Flow Control Type:
Vault
Flow Control Standard:
Wetland
Treatment Standard Type:
Basic Plus
Basic Plus Type:
Enhance
Discharge Point:
Storm System
Total Disturbed Area:
148167
New Impervious Surface:
12000
New Plus Replaced Impervious Surface:
118736
Total Volume Managed by On-Site Stormwater Management (gallons):
432477
Total Area Requiring Soil Amendment:
34032
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Reuse Existing Side Sewer System:
Yes
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
CLARKCG963M2