PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
11500000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
04/06/2022
Permit Issued Date:
03/13/2024
Inspections Completed Date:
05/04/2026
Certificate of Occupancy Issued Date:
05/04/2026
Permit Remarks:
90 Days
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
4447764
Intake Value: Alteration:
0
Total Intake Value:
4447764
Issue Value: New:
4447764
Issue Value: Alteration:
0
Total Issued Value:
4447764
INTERDEPARTMENTAL COORDINATION
SDOT Concept Approval:
Yes
SDOT SIP PM:
KT
BUILDING CODE INFO
What building code was used for your design?:
2018 SBC
Action Type:
New
Number of Proposed Building Stories:
5
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
10' curb cut N 59th St
PARKING
# of Existing Onsite Parking:
0
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
8
# of Proposed Offsite Parking:
0
# of Proposed Accessible Parking:
2
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
31
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
Elevator Pressurization:
No
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
Yes
MECHANICAL DUCTWORK LOCATION
Is there any equipment inside?:
Yes
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Compliance Path:
Component Performance
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
Heating Fuel Type Proposed: Non-Residential:
Electric Heat Pump
Special Requirements:
ERV for residential units.
SIDE SEWER INFORMATION
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
Vault
Flow Control Standard:
Pasture
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
8503
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
8106
Total Volume Managed by On-Site Stormwater Management (gallons):
64429
Total Area Requiring Soil Amendment:
285
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Number of New Dwelling Units:
25
Reuse Existing Side Sewer System:
Yes
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
EDGECCB810OQ
SIDE SEWER INFORMATION
Related New Construction Project:
6795815