PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
1000000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
09/19/2020
Permit Issued Date:
04/23/2021
Inspections Completed Date:
06/10/2022
Permit Remarks:
10/15/2020 RC - ADDRESS CHANGED FROM 3626 TO 3624 1ST AVE NW
Install and maintain one residential curb cut 10' wide to be located along 1st Ave NW and beginning 5' south of the north property line.
CONSTRUCTION VALUATION INFO
Intake Value: New:
479738
Intake Value: Alteration:
0
Total Intake Value:
479738
Issue Value: New:
539840
Issue Value: Alteration:
0
Total Issued Value:
539840
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Does your project qualify for our Priority Green Incentive program?:
Expedited
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
Install and maintain one residential curb cut 10' wide to be located along 1st Ave NW and beginning 5' south of the north property line.
PARKING
# of Proposed Onsite Parking:
4
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
6
Tenant Relocation Assistance
Residential Unit Occupancy:
All Residential Units Occupied by Property Owner
WASTE DIVERSION
Waste Diversion Plan Required:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
No
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Natural Gas
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Weep Hole
Total Disturbed Area:
5000
New Impervious Surface:
3183
New Plus Replaced Impervious Surface:
4162
Total Volume Managed by On-Site Stormwater Management (gallons):
41382
Total Area Requiring Soil Amendment:
838
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Dwelling Units:
6
Reuse Existing Side Sewer System:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
Yes
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
1
Number of New Sewer Connections to the Main:
1