PERMIT APPLICATION COMMON
Where on your property are you working?:
New retaining wall on the south side of the property
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
105000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
10/01/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
105000
Total Intake Value:
105000
Total Issued Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC (Struct) and SRC (Arch)
Is this a substantial alteration?:
No
Action Type:
Add/Alt
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Piles
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
SPECIAL PROGRAMS
Is this project receiving Opportunity Zone Funds?:
No