PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
1750000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
06/01/2020
Permit Issued Date:
09/07/2021
Inspections Completed Date:
09/17/2024
CONSTRUCTION VALUATION INFO
Intake Value: New:
1750000
Intake Value: Alteration:
0
Total Intake Value:
1750000
Issue Value: New:
1750000
Issue Value: Alteration:
0
Total Issued Value:
1750000
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
Add/Alt
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
DRAINAGE INFORMATION
Drainage Type of Work:
Temporary
Number of Other New Drainage Connections:
1
SANITARY INFORMATION
Sanitary Type of Work:
Temporary
Number of New Connections to the Side Sewer:
1
Reuse Existing Side Sewer System:
Yes