PERMIT APPLICATION COMMON
Where on your property are you working?:
RRH Unit replacement is on exterior facade of building. All equipment work to be within existing equipment racks located in an existing equipment room within building.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
10000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
04/09/2020
Permit Issued Date:
06/16/2020
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
10000
Total Intake Value:
10000
Issue Value: New:
0
Issue Value: Alteration:
10000
Total Issued Value:
10000
Total Revision Value:
0
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
Add/Alt
Number of Proposed Building Stories:
0
Number of Proposed Below-Grade Building Stories:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Assembly
Existing Occupancy:
A-5 Stadium
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) on Property Not Affected by Scope
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No