Review Level:
Full C
Application Completed Date:
03/11/2021
Permit Issued Date:
03/03/2022
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
3157055
Total Intake Value:
3157055
Issue Value: New:
0
Issue Value: Alteration:
3157055
Total Issued Value:
3157055
PERMIT APPLICATION COMMON
Where on your property are you working?:
The equipment installation will occur in the NW corner of the property. (Corner of Harrison St. and Taylor Ave.)
The Street improvements will be on the E side of Taylor Ave and N side of Thomas St. (bordering the substation).
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Industrial
Project Value:
3157055
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Specific Building Code:
SEBC Prescriptive
Action Type:
Add/Alt
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
0
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Number of Other New Drainage Connections:
0
Number of Drainage New/Replaced/Repair Pumps:
0
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
4928
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
4928
Total Volume Managed by On-Site Stormwater Management (gallons):
0
Total Area Requiring Soil Amendment:
0
SANITARY INFORMATION
Sanitary Type of Work:
None
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Public Utility
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
Yes