PERMIT APPLICATION COMMON
Where on your property are you working?:
The entire site.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
4025000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
05/14/2020
Permit Issued Date:
05/25/2021
Inspections Completed Date:
12/20/2023
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
4025000
Intake Value: Alteration:
0
Total Intake Value:
4025000
Issue Value: New:
4025000
Issue Value: Alteration:
0
Total Issued Value:
4025000
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Number of Existing Building Stories:
2
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
8
Number of Proposed Below-Grade Building Stories:
3
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Main Existing Use of Building:
Business
Existing Occupancy:
B Office
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Basement
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
None required
PARKING
# of Existing Onsite Parking:
70
# of Existing Offsite Parking:
25
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
292
# of Proposed Offsite Parking:
10
Offsite Parking Location:
Taylor Ave N
# of Proposed Accessible Parking:
7
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
95
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
Elevator Pressurization:
No
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
SIDE SEWER INFORMATION
Related New Construction Project:
6771553
Temporary Dewatering for Construction:
Yes
DRAINAGE INFORMATION
Drainage Type of Work:
Addition/Alteration
Number of Other New Drainage Connections:
1
Discharge Point:
Combined System
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
2
Sanitary Type of Work:
Addition/Alteration
Number of New Connections to the Side Sewer:
1
Reuse Existing Side Sewer System:
Yes