PERMIT APPLICATION COMMON
Where on your property are you working?:
Existing house to be torn down and new house to be constructed in same area. Existing detached garage to be demolished and replaced with driveway to attached garage in rear of house.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
432357
PERMIT TRACKING COMMON
Review Level:
Field
Application Completed Date:
10/03/2020
Permit Issued Date:
10/03/2020
Inspections Completed Date:
02/10/2022
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Occupied by Property Owner
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Basement
DEMOLITION INFO
Type of Demolition:
Demolition
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
REDHAHL832QN