PERMIT APPLICATION COMMON
Where on your property are you working?:
Work will include the full site
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
36841135
CONSTRUCTION VALUATION INFO
Intake Value: New:
36841135
Intake Value: Alteration:
0
Total Intake Value:
36841135
Issue Value: New:
36841135
Issue Value: Alteration:
0
Total Issued Value:
36841135
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Number of Proposed Building Stories:
8
Number of Proposed Below-Grade Building Stories:
2
Number of Mezzanines:
0
Is this a high-rise?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
10/01/2020
Permit Issued Date:
10/28/2021
Inspections Completed Date:
08/22/2024
Certificate of Occupancy Issued Date:
08/22/2024
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
NA
PARKING
Number of Existing Onsite Parking Spaces:
0
Number of Existing Offsite Parking Spaces:
0
Number of Existing Accessible Parking Spaces:
0
Number of Proposed Onsite Parking Spaces:
130
Number of Proposed Offsite Parking Spaces:
0
Number of Proposed Accessible Parking Spaces:
0
Number of Existing Bicycle Parking Spots:
0
Number of Proposed Bicycle Parking Spots:
196
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
Yes
Stairway Pressurization:
Yes
Smoke Removal System:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Component Performance
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Unknown
Heating Fuel Type Proposed: Non-Residential:
Unknown
Special Requirements:
SEC C411: PV
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
1
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
1
Flow Control Type:
Vault
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
28826
New Impervious Surface:
28826
New Plus Replaced Impervious Surface:
28826
Total Volume Managed by On-Site Stormwater Management (gallons):
104896
Total Area Requiring Soil Amendment:
0
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Sewer Connections to the Main:
1
Number of New Dwelling Units:
227
Reuse Existing Side Sewer System:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee