PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
4120277
PERMIT TRACKING COMMON
Permit Issued Date:
09/10/2020
Inspections Completed Date:
02/08/2022
Permit Remarks:
Building Permit issuance is required prior to finalizing this demolition permit; or disturbed areas shall be fully stabilized, and side sewers capped per plan.
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is the ground disturbance in an environmentally critical area?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
DEMOLITION INFO
Type of Demolition:
Demolition
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
CONSTBI982J5