PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Institutional
Project Value:
14421781
CONSTRUCTION VALUATION INFO
Intake Value: New:
14421781
Intake Value: Alteration:
0
Total Intake Value:
14421781
Issue Value: New:
14421781
Issue Value: Alteration:
0
Total Issued Value:
14421781
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Number of Proposed Building Stories:
5
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No
New and Replaced Hard Surface > 750 sq ft?:
Yes
What is the amount of ground disturbance?:
Yes
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
01/09/2020
Permit Issued Date:
09/16/2020
Inspections Completed Date:
12/01/2022
Certificate of Occupancy Issued Date:
12/01/2022
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
Number of Proposed Onsite Parking Spaces:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units on Property Not Affected by Scope
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
Yes
Elevator Pressurization:
No
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
Yes
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Target Performance Path (TPP)
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Electric Resistance
Special Requirements:
SEC C411 by TPP
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
69649
New Impervious Surface:
0
New Plus Replaced Impervious Surface:
32933
Total Volume Managed by On-Site Stormwater Management (gallons):
293368
Total Area Requiring Soil Amendment:
36716
SANITARY INFORMATION
Number of Service Sewer Lines Capped:
3
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Reuse Existing Side Sewer System:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
HOFFMCC164NC