PERMIT APPLICATION COMMON
Where on your property are you working?:
Proposal will encompass the entire lot.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
950000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
01/21/2021
Permit Issued Date:
04/02/2021
Inspections Completed Date:
08/16/2022
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units Unoccupied
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
MRCON**077RZ