PERMIT APPLICATION COMMON
Where on your property are you working?:
The entire site.
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
617000
PERMIT TRACKING COMMON
Review Level:
Field
Application Completed Date:
12/02/2020
Permit Issued Date:
12/02/2020
Inspections Completed Date:
08/11/2021
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Unoccupied
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
No
What is the amount of ground disturbance?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
DEMOLITION INFO
Type of Demolition:
Demolition
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee
I have submitted an application for a building permit from the City of Seattle. I believe the work authorized by this permit is exempt from having a registered contractor. I understand that I may be waiving certain rights that I might otherwise have under state law in any decision to engage an unregistered contractor to perform construction work.:
Yes