PERMIT APPLICATION COMMON
Where on your property are you working?:
All portion of property not within the ECA.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Industrial
Project Value:
3000000
CONSTRUCTION VALUATION INFO
Intake Value: New:
11146642
Intake Value: Alteration:
0
Total Intake Value:
11146642
Issue Value: New:
11146642
Issue Value: Alteration:
0
Total Issued Value:
11146642
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
1
Number of Mezzanines:
0
Is this a high-rise?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
11/13/2019
Permit Issued Date:
05/29/2020
Inspections Completed Date:
05/05/2022
Certificate of Occupancy Issued Date:
05/05/2022
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
1
Curb Cut Size and Location:
28' wide, approximately 23' from NE property corner
PARKING
Number of Existing Onsite Parking Spaces:
8
Number of Existing Offsite Parking Spaces:
0
Number of Existing Accessible Parking Spaces:
1
Number of Proposed Onsite Parking Spaces:
16
Number of Proposed Offsite Parking Spaces:
0
Offsite Parking Location:
n/a
Number of Proposed Accessible Parking Spaces:
1
Number of Existing Bicycle Parking Spots:
0
Number of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Are Emergency Systems Required for this Project?:
No
Elevator Pressurization:
No
Stairway Pressurization:
No
Smoke Removal System:
No
Accessible Elevator Egress:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Total UA Alternative
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Other
Heating Fuel Type Proposed: Non-Residential:
Other
Special Requirements:
C412 solar ready
SIDE SEWER INFORMATION
Related New Construction Project:
6757077
DRAINAGE INFORMATION
Number of Service Drain Lines Capped:
1
Drainage Type of Work:
New
Number of New Drainage Connections to the Main:
2
Flow Control Type:
No Control
Flow Control Standard:
Peak
Treatment Standard Type:
No Treatment
Discharge Point:
Storm System
Total Disturbed Area:
43720
New Impervious Surface:
7283
New Plus Replaced Impervious Surface:
32385
Total Volume Managed by On-Site Stormwater Management (gallons):
194711
Total Area Requiring Soil Amendment:
5672
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Connections to the Side Sewer:
1
Reuse Existing Side Sewer System:
Yes