PERMIT APPLICATION COMMON
Where on your property are you working?:
North 1/2 of back building on ground floor
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Multifamily
Project Value:
30000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
12/21/2019
Permit Issued Date:
10/08/2020
Inspections Completed Date:
02/22/2022
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
30000
Total Intake Value:
30000
Issue Value: New:
0
Issue Value: Alteration:
92225
Total Issued Value:
92225
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
Yes
Are you changing the envelope?:
Yes
Action Type:
Add/Alt
Number of Existing Building Stories:
2
Number of Existing Below-Grade Building Stories:
1
Number of Proposed Building Stories:
2
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
Yes
Main Existing Use of Building:
Residential
Existing Occupancy:
Other R-3 Occupancy
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
Yes
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Existing Onsite Parking:
3
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
0
# of Proposed Onsite Parking:
0
# of Proposed Offsite Parking:
0
Offsite Parking Location:
0
# of Proposed Accessible Parking:
0
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Occupied by Property Owner
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
No
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
No
Other Type of Sprinkler System:
Smoke & CO2 Detectors
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Residential
Compliance Path:
Prescriptive
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Natural Gas
Data Center Building?:
No
Power is Sub-Metered?:
No
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Owner/Lessee