PERMIT APPLICATION COMMON
Where on your property are you working?:
SCOPE OF WORK TO BE
LOCATED ON BOTH
PARCEL A AND B WITH
THE EXCEPTION ON
THE SOUTHWEST
CORNER OF THE LOT
WHERE THERE IS AN
EXISTING CELLULAR
TOWER
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
15000000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
12/09/2021
Permit Issued Date:
06/08/2022
Inspections Completed Date:
09/27/2024
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
Tenant Relocation Assistance
Residential Unit Occupancy:
Residential Units Unoccupied
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
Yes
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Other
DEMOLITION INFO
Type of Demolition:
Demolition
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
ABSHEC*345PS