PERMIT APPLICATION COMMON
Where on your property are you working?:
The entire site
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Single Family/Duplex
Project Value:
30000
PERMIT TRACKING COMMON
Review Level:
Full +
Application Completed Date:
02/13/2020
Permit Issued Date:
03/27/2020
Permit Remarks:
A completed Building permit application for the site or the site be completely stabilized and the side sewer capped before finalizing this demolition permit.
Tenant Relocation Assistance
Residential Unit Occupancy:
Unit(s) Unoccupied
GROUND DISTURBANCE
Is the ground disturbance in an environmentally critical area?:
Yes
What is the amount of ground disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Basement