PERMIT APPLICATION COMMON
Where on your property are you working?:
Lots 23-32, Block 4, Rainier Boulevard ADD.
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
365000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
01/15/2021
Permit Issued Date:
08/01/2022
FLOATING RESIDENCE INFO
Is this building a Floating Residence?:
No
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
365000
Total Intake Value:
365000
Issue Value: New:
0
Issue Value: Alteration:
365000
Total Issued Value:
365000
BUILDING CODE INFO
What building code was used for your design?:
2015 SBC
Is this a substantial alteration?:
No
Are you changing the envelope?:
No
Action Type:
Add/Alt
Number of Existing Building Stories:
3
Number of Existing Below-Grade Building Stories:
0
Number of Proposed Building Stories:
7
Number of Proposed Below-Grade Building Stories:
2
Number of Mezzanines:
0
Is this a high-rise?:
No
Will you change the building use or occupancy?:
No
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
Yes
New and Replaced Hard Surface > 750 sq ft?:
Yes
Are you doing more than 2,000 square feet of earth disturbance?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Piles
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Curb Cut Size and Location:
automobile access will be from the alley
PARKING
# of Existing Onsite Parking:
200
# of Existing Offsite Parking:
0
# of Existing Accessible Parking:
2
# of Proposed Onsite Parking:
250
# of Proposed Offsite Parking:
0
Offsite Parking Location:
na
# of Proposed Accessible Parking:
13
# of Existing Bicycle Parking Spots:
0
# of Proposed Bicycle Parking Spots:
350
Tenant Relocation Assistance
Residential Unit Occupancy:
No Residential Units on Property
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
Yes
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
Yes
Other Fire Protection System:
No
EMERGENCY SYSTEMS
Elevator Pressurization:
No
Stairway Pressurization:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Is any portion of the building semi-heated or unheated?:
Yes
Compliance Category:
Commercial
Is there a commercial kitchen hood exhaust system?:
No
Is there a fume hood?:
No
Is there a spray paint booth?:
No
Describe any other mechanical systems to be installed as part of this project.:
na
DRAINAGE INFORMATION
Drainage Type of Work:
Addition/Alteration
SANITARY INFORMATION
Sanitary Type of Work:
Addition/Alteration
SPECIAL PROGRAMS
Is this project receiving Opportunity Zone Funds?:
Yes
Name of Qualified Opportunity Fund providing project funding?:
OZ Navigator
CONTRACTOR DISCLOSURE
Who will be performing all the work?:
Licensed Contractor
Contractor License:
VENTUGC899LZ