PERMIT APPLICATION COMMON
Where on your property are you working?:
Address parcels 522-514 Federal Ave E
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
4920000
PERMIT TRACKING COMMON
Permit Issued Date:
04/12/2022
Inspections Completed Date:
05/21/2024
Tenant Relocation Assistance
Residential Unit Occupancy:
Some/All Units Occupied by Residential Tenant
GROUND DISTURBANCE
Will your project have ground disturbance?:
Yes
Is the ground disturbance in an environmentally critical area?:
Yes
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Cut Depth in Feet (maximum):
12
Fill Depth in Feet (maximum):
6
Foundation Type:
Basement
Does anyone live or work here?:
Yes
Is the disposal site inside the city?:
Yes