PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
Yes
Choose the Primary Property Use:
Multifamily
Project Value:
658534
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
07/24/2019
Permit Issued Date:
04/30/2020
Inspections Completed Date:
10/01/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
658534
Intake Value: Alteration:
0
Total Intake Value:
658534
Issue Value: New:
699550
Issue Value: Alteration:
0
Total Issued Value:
699550
BUILDING CODE INFO
What building code was used for your design?:
2015 SRC
Action Type:
New
Number of Proposed Building Stories:
3
Number of Proposed Below-Grade Building Stories:
0
Number of Mezzanines:
0
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
I, the owner or owner’s authorized representative of the property referenced in this submission, give the City of Seattle Department of Planning and Development permission to conduct a Pre-Application Site Visit. I agree that: 1) electronic filing constitutes an authorizing signature; 2) I will inform all tenants of the site visit prior to the inspection being conducted; and 3) if conditions such as uncontrolled dogs or uncooperative tenants hinder the inspector’s ability to conduct the site visit, the site visit will not occur and the site visit fee may be forfeited.:
Yes
Foundation Type:
Spread Footing
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
PARKING
# of Proposed Onsite Parking:
1
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Residential
Compliance Path:
Prescriptive
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Residential:
Electric Heat Pump
SIDE SEWER INFORMATION
Related New Construction Project:
6735905
Temporary Dewatering for Construction:
No
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Weep Hole
Discharge Point Other Type:
(SW Holly St)
Total Disturbed Area:
3042
New Impervious Surface:
612
New Plus Replaced Impervious Surface:
1798
Total Volume Managed by On-Site Stormwater Management (gallons):
21890
Total Area Requiring Soil Amendment:
632
SANITARY INFORMATION
Sanitary Type of Work:
New
Number of New Dwelling Units:
3
Reuse Existing Side Sewer System:
Yes
SANITARY INFORMATION
Number of New Connections to the Side Sewer:
1