PERMIT APPLICATION COMMON
Is work in the right-of-way (street or alley) required?:
No
Choose the Primary Property Use:
Commercial
Project Value:
150000
PERMIT TRACKING COMMON
Review Level:
Full C
Application Completed Date:
11/20/2019
Permit Issued Date:
03/24/2020
Inspections Completed Date:
03/11/2021
CONSTRUCTION VALUATION INFO
Intake Value: New:
0
Intake Value: Alteration:
150000
Total Intake Value:
150000
Issue Value: New:
0
Issue Value: Alteration:
150000
Total Issued Value:
150000
BUILDING CODE INFO
What building code was used for your design?:
2015 SEBC
Specific Building Code:
SEBC Prescriptive
Is this a substantial alteration?:
No
Are you changing the envelope?:
Yes
Action Type:
Add/Alt
Is this a high-rise?:
No
Will your application include a new standard plan?:
No
Is a certificate of occupancy required?:
No
GROUND DISTURBANCE
Is your development site in an environmentally critical area (ECA)?:
No
New and Replaced Hard Surface > 750 sq ft?:
No
Are you doing more than 2,000 square feet of earth disturbance?:
No
LAND USE STREET ELEMENTS
Number of Curb Cuts for This Permit:
0
Tenant Relocation Assistance
Residential Unit Occupancy:
No Units on Property
WASTE DIVERSION
Waste Diversion Plan Required:
Yes
FIRE PROTECTION SYSTEMS
Sprinklers Meet NFPA 13:
No
Sprinklers Meet NFPA 13R:
No
Partial Fire Protection System:
No
Fire Alarm:
No
Other Fire Protection System:
No
MECHANICAL CODE
Does your project include an HVAC mechanical system?:
No
ENERGY CODE
Compliance Category:
Commercial
Compliance Path:
Component Performance
Is there a fume hood?:
No
Is there a spray paint booth?:
No
ENERGY EQUIPMENT
Heating Fuel Type Proposed: Non-Residential:
Unknown
Cooling Fuel Type Proposed: Non-Residential:
Unknown
DRAINAGE INFORMATION
Drainage Type of Work:
New
Number of Other New Drainage Connections:
1
Flow Control Type:
No Control
Flow Control Standard:
None
Treatment Standard Type:
No Treatment
Discharge Point:
Combined System
Total Disturbed Area:
2950
New Impervious Surface:
1143
New Plus Replaced Impervious Surface:
2491
Total Volume Managed by On-Site Stormwater Management (gallons):
36198
Total Area Requiring Soil Amendment:
459
SANITARY INFORMATION
Sanitary Type of Work:
None